Overview
This Devices to Everything (D2X) Acceptance Test Plan (ATP) and Summary Report provides the plan, test cases, and test procedures that were used to verify Prototype System (version 2.0) system requirements, as well as a summary of results of the testing executed. Version 2.0 of the Prototype System is the subject of the larger-scale Field Test to be conducted after successful Acceptance Testing.