Sharing Data between Mobile Devices, Connected Vehicles, and Infrastructure: D2X Hub Prototype Acceptance Test Plan and Summary Report

Overview

This Devices to Everything (D2X) Acceptance Test Plan (ATP) and Summary Report provides the plan, test cases, and test procedures that were used to verify Prototype System (version 2.0) system requirements, as well as a summary of results of the testing executed. Version 2.0 of the Prototype System is the subject of the larger-scale Field Test to be conducted after successful Acceptance Testing.

Content Type
Background Material
Issue Date
Insitutional, Organizational, and Process
Planning Analysis Tools
Planning Analysis Tools
Tactical Element
TOM Chapters
6.5
29.5
View Related
Role in Organization
Senior Engineer
Researcher/Academic
Principal Engineer
Manager / First Line Supervisor
Director / Program Manager
Engineer
Senior Manager
Associate Engineer
Publishing Organization
FHWA
Prime Contractor
Dave Valentine, Ben Paselsky, Margaret Hailemariam, Rama Boyapati
Publication Number
FHWA-JPO-18-621